PLEASE READ ALL OF THE OWNERS MANUAL AND SAFETY NOTESIMPORTANT SAFETY NOTES:1. When installing your stove, particular attention should be paid to fire
A chimney must be the required height above the roof or other obstruction for safety and proper draft operation.The chimney must be a minimum of 3’ (9
2. THIMBLE: An approved thimble must be used when the connection from the stove is made through acombustible wall to a masonry chimney. There are se
Minimum 3 ½” (89mm) [4” (102mm) nominal] thick solid bricks are to be used. The fire clay liner(ASTM C35 or equivalent), 5/8” (16mm) wall thickness,
First, build the frame for the thimble, making sure that it is no smaller than 14½” (368mm) diameter, which willmaintain a 2” (50mm) air space around
CONNECTION TO A METAL PREFABRICATED CHIMNEYWhen a metal prefabricated chimney is used, the manufacturer’s installation instructions must be followedpr
MOBILE HOME INSTALLATIONYou must use a Quadra-Fire 3100 outside air kit (see page 16 for part numbers) for installation in a mobilehome. Use of alter
3100 PEDESTAL MODELS1. Kit includes two 1” (25mm) rope gaskets to be tucked under pedestal to seal off both sides.2. Floor installation: Cut a 4” (10
1. Place protective pad or stove pallet on floor.2. Lay body of stove on its back on protective pad or pallet.3. Slide pedestal over adapter on bot
Page 181. Remove ash removal system top andbottom cover plates by loosening nutsunder stove.2. Discard both plates.3. Insert ash removal system gra
ASH REMOVAL SYSTEM OPERATING AND CLEANINGCAUTION: Do not operate stove with ash removal system door open. Store ash in metal container until hotembe
TABLE OF CONTENTSSafety label ...
OPERATING INSTRUCTIONSIMPORTANT - PLEASE READ BEFORE USING STOVEBURNING PROCESSIn recent years there has been an increasing concern about air quality.
OPERATING INSTRUCTIONS (cont.)BLOWER OPERATING INSTRUCTIONS(see blower installation instructions on page 27)If your Quadra-Fire wood stove is equipped
OPERATING INSTRUCTIONS (cont.)BURNING GUIDELINES (cont.)MEDIUM: After a wood load has been burning on high for at least 15 minutes (longer for very l
MAINTENANCECREOSOTE1. Formation and need for removal: When wood is burned slowly, it produces tar and other organic vapors whichcombine with expelled
1. Remove door from stove and lay on a padded flat surface.2. Remove glass tabs and screws with a Phillips screwdriver (turn screws counterclockwise).
BAFFLE REMOVAL AND INSTALLATIONNOTE: The baffle in the 3100 stove is heavy (29 pounds). Moving the baffle around inside the stove takesstrength and
BRICK PATTERN8. To install the baffle, repeat steps 2 through 7 in reverse. Be sure that the hole in the baffle is on its alignmentpin on the rear s
INSTALLATION OF OPTIONAL BLOWERPart #831-1700The blower is shipped fully assembled and ready for installation.1. Remove three ¼”-20 (3/8” hex head) bo
1. Unscrew and remove the rear heat deflector.2. Attach the two “S” clips to the upper edge of the outer wall of the stove.3. Set top heat shield on s
Page 29ACCESSORIES AND SERVICE PARTSACCESSORIES831-1650 Top shield, gold831-0971 Top shield, black831-1730 Outside air kit, pedestal831-1740 Outside a
3100 SAFETY LABEL(found on back of stove)Page 3Manufactaured by:Model:Quadra-Fire3100Serial No.
NOTESPage 30
NOTESPage 31
Aladdin Hearth Products, warrants their wood heating appliances to the original purchaser for the lifetime of the appliance, to be freefrom defects in
24 1/2" (622mm)9" (229mm)21 1/2" (546mm)2 1/4" (57mm)23" (584mm)DIMENSIONSPage 4FIGURE 1bFIGURE 1a20 1/2" (521mm)9"
DIMENSIONSPage 526 5/8" (676mm)23 7/8" (606mm)13 11/16" (348mm)4 5/16" (110mm)24 5/8" (626mm)25" (635mm)9" (229mm)2
Minimum clearances to Combustible Materials (in inches and millimeters) for Quadra-Fire 3100 Standard StoveChimney &Installation Clearance Connect
SAFETY LISTINGThe Quadra-Fire 3100 is listed by OMNI-Test Laboratories, Inc. , Beaverton, Oregon, to UL 1482-83, (UM)84HUD and ULC S627. It is also a
CHIMNEY CONNECTORThe chimney connector must be 6” (152mm) diameter with a minimum thickness of 24 gauge. Do not usealuminum or galvanized steel. The
A chimney inside the house must have at least 2” (50mm) of clearance to the combustible structure. A chimneyoutside the house must have at least 1” (
Commentaires sur ces manuels